Constructability Reviews
A coordination pass on your Revit and Navisworks models before drawings release for bid — clash, access, and buildability flags that catch what becomes an RFI later.
Pre-bid · fewer RFIs & change ordersCoordination, run by people who've run it. Consulting engagements direct with your team — scoped per project, priced per engagement. Pick a service for the full detail; the first scoping call is 15 minutes and we'll tell you whether we can help.
A coordination pass on your Revit and Navisworks models before drawings release for bid — clash, access, and buildability flags that catch what becomes an RFI later.
Pre-bid · fewer RFIs & change ordersNavisworks clash management that ends in sign-off, not a 4,000-row export nobody reads — matrix setup, hard and clearance runs, and trade-by-trade reporting driven to zero.
Hard + clearance · sign-off-readySomeone whose job is the federated model, the meetings, and the schedule — from BIM execution planning through coordination sign-off. ACC, BIM 360, or Navisworks.
Kickoff to sign-off · ownedConstructible models the shop can build from — LOD 350/400 fabrication detail through field-verified LOD 500 as-builts, for MEP trades and miscellaneous metals.
LOD 350–500 · shop-readyTell us about the project. First scoping call is 15 minutes — we'll tell you whether we can help.
Start a conversation